accuboost

  1. C

    S Plan Vented converting to Unvented in Restricted Space

    I have a vented S Plan with a System Boiler stacked over the DHW Cylinder in a tight airing cupboard. The Cylinder is 1150 High and over it is a Vaillant Boiler. All is working perfectly with flow to a first floor shower just acceptable and we have plenty of stored hot water. But we are about to...
Back
Top