I am installing a new bathroom which will have a 5.5m run of soil pipe from the toilet to the stack. I am planning to turn the pipe 45 degrees immediately after the toilet, then a first run of 1m, followed by another 45 degrees, then the remaining 4.5m to the stack. This will all be with...