invoice

  1. J

    House extension- are windows part of ‘first fix’? Invoice dispute!

    Hi all, I’m currently having a large home extension built, with payment to the builder in stages, and I’ve received the latest invoice following ‘first fix’ of electrics and plumbing. However: The builder still hasn’t fitted any windows or doors to the extension, and I’m wondering whether I...
  2. Fishwalker

    Advice wanted on work done to alliviate damp

    Hi I've posted in the trade talk forum the following link, but am being asked there to ask in this forum, about whether it is fine that the replacement 'packing wood' 'pan wood' installed between the physical damp course and bricks above, is a remedy to resolve the rising damp we have in a...
  3. Fishwalker

    Advice needed on paying invoice when work done different to quote

    Hi. Sorry this is in Trade but I need advice from you trade peeps. We had 1m high of plaster hacked off at skirting level and reinstated last week, to remedy a rising damp patch on an internal wall, due to wet, rotten pan wood sitting on top of the original bitumen damp course (1.5m). The...
  4. B

    Party wall surveyor invoiced despite being told straight away that his services wouldn't be required

    Following planning permission we served a 3m excavation notice to a neighbour (who had put in an objection) under the party wall act. After 11 days of not hearing anything my husband went round to ask them their thoughts and remind them that if after 14 days we automatically enter dispute. They...
Back
Top