Bit of a long story, but will try to cover the facts!
Wall was professionally replastered September.
Wall was sized with 3 coats of Contract Matt And Water 50/50 October.
Wall was papered with Superfresco Easy (Paste the wall) December 5th.
Come January 2nd, the edges of the paper have shrunk...