Hi. First time poster. We’re taking out an external wall to fit 5.5m bifolds. There’s a 6m rsj to be installed above the bifolds and the piers are to be rebuilt from foundation to beam using 215x440 padstones. This is all fine but our SE has recommended wind posts either side of the bifolds at...