100mm concrete floor slab drying time

Joined
21 Oct 2014
Messages
1,619
Reaction score
205
Location
West Midlands
Country
United Kingdom
Im gonna be pouring a 100mm floor slab very late in my build due to unforeseen (to me) circumstances. Was hoping to floor tile imminently but clearly this is now put back for this part of the floor.

I know concrete cures by chemical reaction with water but then drys out. Is it correct to assume 1day per mm? So 100 days before tiling?
 
Sponsored Links
From my reading, the tiles can delaminate away from the slab. This is all s major PITA as I was gonna SLC the lot then tile really soon. Looking like 100 days away now unless someone suggests otherwise. :(
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top