Im gonna be pouring a 100mm floor slab very late in my build due to unforeseen (to me) circumstances. Was hoping to floor tile imminently but clearly this is now put back for this part of the floor.
I know concrete cures by chemical reaction with water but then drys out. Is it correct to assume 1day per mm? So 100 days before tiling?