Hi I am putting the pipework in for a heating system and am left with 3 rads to pick up with 13,333 btus of heat needed for this 3 rads. After the last rad on the circuit before these 3. Is around 4 meters, I have ran 22mm from there. I plan on reducing down to 15mm around 300 mm before picking up the first of these 3 rads. Should that be ok? On a sealed combi system