I am going to a 17th edition seminar on Thursday.
Any questions you think need asking?
Any questions you think need asking?
Because most people who buy it have no choice, so they have to pay whatever it costs.Why has it gone up to £65?
It was next in line. The next reprint incorporating amendments to date should be green.Why have they chosen red as the colour as it clashes with my corporate colours?
I am going to a 17th edition seminar on Thursday.
Any questions you think need asking?
What is their view on the debate surrounding testing of existing circuits and EICs for replacement CUs given that EICs may no longer contain Fails or LIMs.
What is their view on the debate surrounding testing of existing circuits and EICs for replacement CUs given that EICs may no longer contain Fails or LIMs.
I am going to a 17th edition seminar on Thursday.
Any questions you think need asking?
How should you comply with the regs if a circuit is intended to supply one or more items of fixed equipmet, such that the total protective conductor current is likely to exceed 10mA (as per regulation 543.7), and incorporates a cable in a wall or partition at a depth of less than 50 mm from a surface of the wall or partition (as per regulations 522.6.6 / 522.6.7)
I am currently working on an installation where this situation has asrisen. It is an acceptable installation to the 16th edition, but not to the 17th.
The new regs call for the use of a 30mA RCD to protect the concealed wiring, but this would not be suitable due to the intended high leakage currents present on the installation.
Fail's maybe, but not sure that 742-01-04 means that you can't have LIMs....EIC's couldn't contain fails or LIMs under the 16th so no change there.
Fail's maybe, but not sure that 742-01-04 means that you can't have LIMs....EIC's couldn't contain fails or LIMs under the 16th so no change there.
Not talking about installing and certifying, but inspecting and testing an existing installations.That'll stop fails but LIMS on an EIC? If you're installing and certifying why would there be any limitations?
So are you saying that you won't change a CU if you can't first issue an EIC for the existing wiring?That means ALL defects and omissions if it's a board change as an EIC is required.
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local