I have had a conservatory put up and they have laid a floating floor made up of T&G chip/b with a foam 50mm underneath. Trouble is at most edges it is moving up and down and noisy in places.
I know this is not right, but how do I get them to lay the right floor, ie battens then board ? quick reply needed javascript:emoticon('')
I know this is not right, but how do I get them to lay the right floor, ie battens then board ? quick reply needed javascript:emoticon('')