Hi all,
I have a workshop which is effectively a barn with a steel frame, steel tin roof and wood frame / shiplap cladding. I am looking at where SSEN will / wont install their 3 Phase Internal Cut Out / Meter. It states that it CANNOT BE in a wood frame building.
Any idea how I terminate 3 Phase from SSEN then? I could take it to the house instead but then I need to run cables all the way to the workshop whereas if the workshop has this terminated there, I run single phase back to the house as it only needs L / N.
Thanks in advance.
I have a workshop which is effectively a barn with a steel frame, steel tin roof and wood frame / shiplap cladding. I am looking at where SSEN will / wont install their 3 Phase Internal Cut Out / Meter. It states that it CANNOT BE in a wood frame building.
Any idea how I terminate 3 Phase from SSEN then? I could take it to the house instead but then I need to run cables all the way to the workshop whereas if the workshop has this terminated there, I run single phase back to the house as it only needs L / N.