I have a sloping kitchen floor and i have used screed to level the floor. The deepest part of the screed is 7.5cm deep.
Mapei technical said that i have to wait 8 weeks before i can apply mapei 3240 self levelling compound. Is this really true?
I'm half way through a kitchen project and my house is freezing as i had to chop the bottom of the door off to get the floor levelled. If it is true than i will obviously wait out.
just wondering what builders usually do? What is the issue with laying SLC on top of the screed before 8 weeks?
Mapei technical said that i have to wait 8 weeks before i can apply mapei 3240 self levelling compound. Is this really true?
I'm half way through a kitchen project and my house is freezing as i had to chop the bottom of the door off to get the floor levelled. If it is true than i will obviously wait out.
just wondering what builders usually do? What is the issue with laying SLC on top of the screed before 8 weeks?