- Joined
- 1 Jan 2007
- Messages
- 2
- Reaction score
- 0
- Country
Hi Guys can you please advise me on the following.
I have just had a conservatory installed with a half georgian roof. Where the conservatory and roof are fitted to the house, the whole of the external wall of the house that is now inside the conservatory is wet. Consequently my floor and stud work is getting wet.
When the roof was fitted the builder used flash band and cut in lead flashing as well.
My question is how deep does the flashing need to be cut in, as the water is coming from behind the rendering.
Thanks in advance for your help
Keith
I have just had a conservatory installed with a half georgian roof. Where the conservatory and roof are fitted to the house, the whole of the external wall of the house that is now inside the conservatory is wet. Consequently my floor and stud work is getting wet.
When the roof was fitted the builder used flash band and cut in lead flashing as well.
My question is how deep does the flashing need to be cut in, as the water is coming from behind the rendering.
Thanks in advance for your help
Keith