This last week, we have had the full roof re-tilled.
After three quotes, differing between £3500 compleete, too £900 labour only. I took the labour only, as I was not working, I purchased the materials. The whole job, which was, re-felt and battons, re-tile, also new facia bords and gutters. the full job cost a totall of £1997. which we feel was a good result. it looks perfect, and we are more than happy.
.
the questions are. When laying the tile, he did not nail them in place. Also he laid them on top and in line. What I mean is the roof took 14 tile accross, on the first row he started with a full tile, the second row I expected him to cut half a tile and start, then at the other end lay the half tile! But no, he laid a full tile on top of the last. Could any roofer tell me if this is general practise?
After three quotes, differing between £3500 compleete, too £900 labour only. I took the labour only, as I was not working, I purchased the materials. The whole job, which was, re-felt and battons, re-tile, also new facia bords and gutters. the full job cost a totall of £1997. which we feel was a good result. it looks perfect, and we are more than happy.
.
the questions are. When laying the tile, he did not nail them in place. Also he laid them on top and in line. What I mean is the roof took 14 tile accross, on the first row he started with a full tile, the second row I expected him to cut half a tile and start, then at the other end lay the half tile! But no, he laid a full tile on top of the last. Could any roofer tell me if this is general practise?