Have just fitted a Honeywell Reson 8 box to the outside wall and wired in. Wanting advice on the appropriate connection sequence - what should be switched on or off during this procedure?
There are 5 things to deal with :-
1. Control panel mains supply, on or off ?
2. Control panel battery - and + terminals, on or off ?
3. Control panel switch, on or off ?
4. Bell box battery pin terminal, on or off ?
5. Bell box timer pin settings :-
J6 test 5 seconds
J5 20 minutes
J4 10 minutes
J3 5 minutes
What should I expect to hear and see if all is well ??
There are 5 things to deal with :-
1. Control panel mains supply, on or off ?
2. Control panel battery - and + terminals, on or off ?
3. Control panel switch, on or off ?
4. Bell box battery pin terminal, on or off ?
5. Bell box timer pin settings :-
J6 test 5 seconds
J5 20 minutes
J4 10 minutes
J3 5 minutes
What should I expect to hear and see if all is well ??