adding a rad

Joined
9 Nov 2005
Messages
50
Reaction score
0
Country
United Kingdom
I have searched and found various options regarding adding a rad to a combi system,some sound a bit daunting,bleeding systems,opening valves etc.My worcester 24i boiler is in my loft and all the rads are fed by downpiping,I want to add a rad and wonder if it is possible to prepare everything first and the cut into the 15 mm plastic piping in the loft that feeds another rad and then quickly connect everything up without losing to much water from the system,do you think this would work considering all the rads will be beneath the new connection.
cheers
 
Sponsored Links
Once the 1bar of pressure has been released....should be relatively dry thereafter ;)
 
Thanks nigelf,I presume from your reply that I would only need to bleed the rads after doing the work.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top