Hi,
we're mid way through a conservatory build and we're at the point of disussing the raditor requirements.
We're planning on adding a long double rad and the nearest pipes are in the lounge.
The lounge rad is also a long double rad, and is last in the circuit. Feed is from 15mm, which is buried in the floor.
To complicate matters, there is already a tee off the feed/return of the lounge rad for a small single rad in the kitchen (direct opposite side of wall)
The current suggestion is that another tee is added to the kitchen side of the wall to feed the conservatory, meaning there will be 2 tees in close proximity.
I am concerned that this will cause flow problems somewhere in this circuit and one or more of the rads won't get hot enough.
The boiler will be able to cope, as we are getting a new one fitted, with 30% capacity over requirements.
I've read about reducing bore size to increase flow - assuming that this additional tee is OK, should we be reducing the new run to 10mm, or would 15mm still be OK?
Thanks in advance,
Jamie.
p.s. I know rads in a conservatory aren't the best idea, but you try convincing my wife, who is also funding all the work.
we're mid way through a conservatory build and we're at the point of disussing the raditor requirements.
We're planning on adding a long double rad and the nearest pipes are in the lounge.
The lounge rad is also a long double rad, and is last in the circuit. Feed is from 15mm, which is buried in the floor.
To complicate matters, there is already a tee off the feed/return of the lounge rad for a small single rad in the kitchen (direct opposite side of wall)
The current suggestion is that another tee is added to the kitchen side of the wall to feed the conservatory, meaning there will be 2 tees in close proximity.
I am concerned that this will cause flow problems somewhere in this circuit and one or more of the rads won't get hot enough.
The boiler will be able to cope, as we are getting a new one fitted, with 30% capacity over requirements.
I've read about reducing bore size to increase flow - assuming that this additional tee is OK, should we be reducing the new run to 10mm, or would 15mm still be OK?
Thanks in advance,
Jamie.
p.s. I know rads in a conservatory aren't the best idea, but you try convincing my wife, who is also funding all the work.