Adding inhibitor to pressurised system

Joined
5 Oct 2005
Messages
581
Reaction score
2
Country
United Kingdom
I don't have the special tool/applicator to insert the inhibitor to my system, so guess best next option is to close valves on all top floor rads, drain off excess pressure so I can open a valve and pour in to the floor to rad pipe with a funnel?
 
Sponsored Links
Just one dean after you lock off the valves at the side of the rad you use, a towel rail is handy for this, usually higher than the rads
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top