Hi all,
Can anyone please suggest solution to adding two small (c.18 and c.12m) loops to an existing heating setup that consists, in short, of:
UFH throughout downstairs, split across 2 manifolds each with a mixer and pump set but no temperature control other than mixer and flow rate
Large K2 rads upstairs
Currently gas boiler running weather comp and max flow temp of 40degrees, probably will move to ASHP soon
28mm primaries, down to 22mm for feeding each pair of rads (each rad 15mm)
Each loop is in an upstairs bathroom and ensuite respectively. Neither need huge amounts of heat and didn't actually have any last winter and were just about ok with heat from the rest of the house but definitely need something.
So the question is how to plumb these two loops in. Access to the existing manifolds isn't an option.
1. Install a two port manifold with mixer and pump set and feed with the existing 22mm feed for the pair of rads in these rooms (feels like overkill!)
2. Install a two port manifold with just mixer and fed from existing
3. Install a two port manifold and feed directly from existing
4. Plumb directly into the existing 22mm pipework for the existing pair of rads and treat just like a radiator (but not sure how I'd do heat control, if indeed needed)
Thanks in advance for thoughts
Can anyone please suggest solution to adding two small (c.18 and c.12m) loops to an existing heating setup that consists, in short, of:
UFH throughout downstairs, split across 2 manifolds each with a mixer and pump set but no temperature control other than mixer and flow rate
Large K2 rads upstairs
Currently gas boiler running weather comp and max flow temp of 40degrees, probably will move to ASHP soon
28mm primaries, down to 22mm for feeding each pair of rads (each rad 15mm)
Each loop is in an upstairs bathroom and ensuite respectively. Neither need huge amounts of heat and didn't actually have any last winter and were just about ok with heat from the rest of the house but definitely need something.
So the question is how to plumb these two loops in. Access to the existing manifolds isn't an option.
1. Install a two port manifold with mixer and pump set and feed with the existing 22mm feed for the pair of rads in these rooms (feels like overkill!)
2. Install a two port manifold with just mixer and fed from existing
3. Install a two port manifold and feed directly from existing
4. Plumb directly into the existing 22mm pipework for the existing pair of rads and treat just like a radiator (but not sure how I'd do heat control, if indeed needed)
Thanks in advance for thoughts