We have a GRP Topseal flat roof. It is a flat roof within a parapet wall - so meets brick on asll 4 sides..As far as I can tell it looks to me like the mat and bonding have just been ran up the wall...(there are water stains in the corner of the ceiling) I assume there should have been a C and D trim all round - or something? In which case can I just add the trim and reseal or do does it need to have been integrated with the original bond to be successful..