Hi all, wondering if someone could give me some much needed advice. Having spent five months waiting for my bathroom to be renovated by what turned out to be a cowboy builder, I have since decided to refurbish the bathroom myself, as there had been a leak, which meant that the bathroom suite and flooring had to be ripped out.
The builders replaced the flooring with chipboard, and plastered the walls. Since then I have had the walls tiled, by a family friend, who's skill's are questionable.
I have since boarded the floor using 9mm plywood, and sealed all the joints with silicone, and have sorted the plumbing out myself, and installed the bath. I am going to use 30 cm x 60 cm ceramic tiles on the floor, and have also purchased unibond flexible wooden floor adeshive, and mapei flexible grout.
I need to know if I can tile straight onto the plywood, or do I need to prime the surface. Also what size spacers should I use. Will the unibond adhesive be ok, as the floor is out in places.
Many thanks
The builders replaced the flooring with chipboard, and plastered the walls. Since then I have had the walls tiled, by a family friend, who's skill's are questionable.
I have since boarded the floor using 9mm plywood, and sealed all the joints with silicone, and have sorted the plumbing out myself, and installed the bath. I am going to use 30 cm x 60 cm ceramic tiles on the floor, and have also purchased unibond flexible wooden floor adeshive, and mapei flexible grout.
I need to know if I can tile straight onto the plywood, or do I need to prime the surface. Also what size spacers should I use. Will the unibond adhesive be ok, as the floor is out in places.
Many thanks