Hi all. I am at the stage of plastering the new kitchen extension I have just built. I have got 3 walls to plaster with hardwall, ceiling to skim with multi-finish and one dry-lined wall to skim.
I was going to plaster the 3 walls I need to plaster and leave them to go off before skimming everything, starting with the ceiling. However, according to a couple of other posts I have read, it seams that the advice is to finish an entire wall in one go before the float coat goes off.
I have never plastered before and am not sure how quick I am going to be. Would it be posible to get the hardwall on the walls in one or two days and then start skimming?
I was going to plaster the 3 walls I need to plaster and leave them to go off before skimming everything, starting with the ceiling. However, according to a couple of other posts I have read, it seams that the advice is to finish an entire wall in one go before the float coat goes off.
I have never plastered before and am not sure how quick I am going to be. Would it be posible to get the hardwall on the walls in one or two days and then start skimming?