Where our kitchen extension joins the existing kitchen there is a step formed beause the new walls have to have insulation in them as well as a clear cavity.
I have removed the existing browning and plaster from the kitchen wall (Rather too easily as it flaked off!) Leaving a step of approx 1/2" compare to the new wall..
The plan is to plasterboard both the existing and new walls with don'n'dab and then get a plasterer to skim over it afterwards.
What is the easiest way to build up the old wall to match the new, could I apply 12.5mm plasterboard with don'n'dab and then screw another 12.5mm plasterboard on top after?
I have removed the existing browning and plaster from the kitchen wall (Rather too easily as it flaked off!) Leaving a step of approx 1/2" compare to the new wall..
The plan is to plasterboard both the existing and new walls with don'n'dab and then get a plasterer to skim over it afterwards.
What is the easiest way to build up the old wall to match the new, could I apply 12.5mm plasterboard with don'n'dab and then screw another 12.5mm plasterboard on top after?