Hi all
I'm moving into a new house, we got it for a bargain because it's in pretty poor condition.
Floor plan
Photos
I'm not sure about the order in which we should do work to it. The 'essentials' that need doing are:
-Rip up the carpet and restore wooden floors (DIY)
-Repair/replace any plaster and repaint walls (DIY)
-Install central heating
-Split bedroom three into two and put in a bathroom (Half DIY)
-Knockdown and build kitchen side extension. Probably go for underfloor heating.
So the main point for me is central heating. Should we get this installed before doing kitchen side extension (which may take 6 months or so), or can we save money by doing it during/after extension? We could install a wood stove in the lounge for now until we can do central heating. If its best to do before, should we get it installed before we start work on the floors - that makes sense, yes?
Additionally, if we get the bathroom installed upstairs, will all the new pipework required downstairs have to be pulled up and redone during the extension, should we wait until after/during extension? And if it's fine to get on and do this before the extension can get central heating in before we do extension?
All advice/criticism welcome.
Cheers
Jake
I'm moving into a new house, we got it for a bargain because it's in pretty poor condition.
Floor plan
Photos
I'm not sure about the order in which we should do work to it. The 'essentials' that need doing are:
-Rip up the carpet and restore wooden floors (DIY)
-Repair/replace any plaster and repaint walls (DIY)
-Install central heating
-Split bedroom three into two and put in a bathroom (Half DIY)
-Knockdown and build kitchen side extension. Probably go for underfloor heating.
So the main point for me is central heating. Should we get this installed before doing kitchen side extension (which may take 6 months or so), or can we save money by doing it during/after extension? We could install a wood stove in the lounge for now until we can do central heating. If its best to do before, should we get it installed before we start work on the floors - that makes sense, yes?
Additionally, if we get the bathroom installed upstairs, will all the new pipework required downstairs have to be pulled up and redone during the extension, should we wait until after/during extension? And if it's fine to get on and do this before the extension can get central heating in before we do extension?
All advice/criticism welcome.
Cheers
Jake