Hi guys.
I would like to lay the wiring for a mirror heater before my bathroom walls are plastered next week.
Is it possible to run this 85W heater from the lighting supply by running a lead up to the loft as the only other mains supply is under the floor and would mean going all the way up the the loft in a dry zone to come down to the mirror as it will live right above the sink.
http://cgi.ebay.co.uk/BATHROOM-MIRR...rms=39:1|66:2|65:7&_trksid=p3286.c0.m14.l1318
I would like to lay the wiring for a mirror heater before my bathroom walls are plastered next week.
Is it possible to run this 85W heater from the lighting supply by running a lead up to the loft as the only other mains supply is under the floor and would mean going all the way up the the loft in a dry zone to come down to the mirror as it will live right above the sink.