So we are on the last bit of installation…the wiring…its straight forward (or so I thought) Y-Plan. The boiler needs pump overrun.
My installer said just run a five core down to the boiler and I'll check it all later.
The 5-cores being L-N-E -swL and L for the pump overrun.
I got the wiring diag. direct from Alpha. It shows the normal L-N-E and switched live from the Honeywell 10-way block going to the boiler terminal block. It then shows a L-N-E from the boiler terminal block running directly to the pump.
So I phone Alpha Tech.Dept and ask, do I really need to supply the pump direct from the boiler terminal block. Why can’t I take the Live from the Boiler Terminal Block up to the spare way on the Honeywell block. Then pick up a N and E from the 10-way block and take all three wires to the pump. The guy said no. We want a direct supply to the pump. You will have to run another 3-core. I can do it but would rather not as I have to take up some flooring again.
I can see his argument that it is safer to run the cable direct..less chance of a loose wire interfering with the overrun I guess. I see on the boiler wiring diag. that there is a block on the boiler board called x16, it feeds the L&N on the boiler terminal block which supply the pump.
I phone my installer and he said a five core is all I ever run, as long as the pump overrun works then all is OK
Comments please from you professionals..do you just run a 5-core? I just don’t want any problem with the warranty.
My installer said just run a five core down to the boiler and I'll check it all later.
The 5-cores being L-N-E -swL and L for the pump overrun.
I got the wiring diag. direct from Alpha. It shows the normal L-N-E and switched live from the Honeywell 10-way block going to the boiler terminal block. It then shows a L-N-E from the boiler terminal block running directly to the pump.
So I phone Alpha Tech.Dept and ask, do I really need to supply the pump direct from the boiler terminal block. Why can’t I take the Live from the Boiler Terminal Block up to the spare way on the Honeywell block. Then pick up a N and E from the 10-way block and take all three wires to the pump. The guy said no. We want a direct supply to the pump. You will have to run another 3-core. I can do it but would rather not as I have to take up some flooring again.
I can see his argument that it is safer to run the cable direct..less chance of a loose wire interfering with the overrun I guess. I see on the boiler wiring diag. that there is a block on the boiler board called x16, it feeds the L&N on the boiler terminal block which supply the pump.
I phone my installer and he said a five core is all I ever run, as long as the pump overrun works then all is OK
Comments please from you professionals..do you just run a 5-core? I just don’t want any problem with the warranty.