Am at early doodling stages of planning a garden office - would appreciate any guide to rough costs for the following, just so I can make fundamental feasibility decisions (location is just inside M25 - outer London borough, not central or even London postal)
1) Per sq m or sq foot of concrete base suitable for single-storey wooden building. The ground is flat and level, currently grassed. Clay soil.
2) Per m or per foot of water supply and waste (inc. foul) to connect to existing supply and drains on my land, max distance around 6-7m. Will involve digging through and then making good an existing concrete driveway.
1) Per sq m or sq foot of concrete base suitable for single-storey wooden building. The ground is flat and level, currently grassed. Clay soil.
2) Per m or per foot of water supply and waste (inc. foul) to connect to existing supply and drains on my land, max distance around 6-7m. Will involve digging through and then making good an existing concrete driveway.