Can anyone give me an idea of what i should expect to pay for parts and labour of a bonded oil tank, a condensor boiler, control pipe for underfloor heating manifold, all copper piping ,waste and traps and fitting of bathroom with basin loo and bath with shower over, en suite with 1200 shower basin and loo , downstairs loo and basin . pipes to 2 sinks kichen and utility .oh and 5 or 6 rads . Thanks for looking