Hi,

Building a detatched garage at the moment - foundation trench was filled with concrete and couple of courses of blocks/bricks have been laid.

Is it OK to backfill the trench to ground level with topsoil right up to the wall? Or is some kind of rainwater drainage system close to the wall advised to take water away from the wall?

Would appreciate some advice.

Thanks in advance.
 
Sponsored Links
For some reason no one wants to answer your question. Possibly it’s your user name?:LOL: :LOL:
If your brick footings are up to slab level, then backfill away. Don’t stamp fill down if your sub base is not in. Let it settle on own accord and top up later.
You do not need any drainage round perimeter.
oldun
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top