Hi all,
I've been digging out the front garden and had the soil taken away in a skip, however our plans have changed slightly and I now need to raise the dug out area by an inch or two.. Before laying the MOT and finishing gravel.
What is the best material to use to top the level back up, so that it won't affect the stability of the driveway sub base?
I've been digging out the front garden and had the soil taken away in a skip, however our plans have changed slightly and I now need to raise the dug out area by an inch or two.. Before laying the MOT and finishing gravel.
What is the best material to use to top the level back up, so that it won't affect the stability of the driveway sub base?