- Joined
- 17 Oct 2017
- Messages
- 14
- Reaction score
- 0
- Country
Hi. I'm using Bal Primer on plasterboard before I intend to tile but was wondering how long I can leave the board until I need to tile after I have primed. Can I prime the board a day before I tile? I have seen somewhere on here that I should tile 30mins after tiling. To me that sounds like overkill. It says on the bottle that the primer should be left to dry for 30mins before tiling, but it doesn't say I HAVE to tile straight after the primer is dry. Any thoughts on the issue? Cheers.