Working out some numbers for a concrete slab. Can someone confirm the cement volume needed
1.44m3 x 1.76 = 2.53 tonne. I'm going to use a 1:5 ratio. So If I use the ratio on 2.53t of ballast and need to add extra for cement or is the 2.53t the total amount of ballast and cement.
ie 2.53 x 0.2 (1/5) = 0.506 (506kg) = 20bags of cement & 2.024t of ballast.
Any help would be appreciated
1.44m3 x 1.76 = 2.53 tonne. I'm going to use a 1:5 ratio. So If I use the ratio on 2.53t of ballast and need to add extra for cement or is the 2.53t the total amount of ballast and cement.
ie 2.53 x 0.2 (1/5) = 0.506 (506kg) = 20bags of cement & 2.024t of ballast.
Any help would be appreciated