Hi guys.
As per my other post I’m on with my cloakroom so got a couple of questions.
I have a wall hung corner basin. Last time I hung one I think I drilled through the tiles after they were fitted to then hang the basin, is this right or should I be fixing the bolts then getting the tiler to tile round the bolts?
secondly. I’m doing a wall hung toilet on a grohe frame. I am tiling with metro tiles, suddenly occurred to me whether this was ok or not due to the tiles not being “flat”. Anyone done wall hung toilets with metro tiles?
cheers!!
As per my other post I’m on with my cloakroom so got a couple of questions.
I have a wall hung corner basin. Last time I hung one I think I drilled through the tiles after they were fitted to then hang the basin, is this right or should I be fixing the bolts then getting the tiler to tile round the bolts?
secondly. I’m doing a wall hung toilet on a grohe frame. I am tiling with metro tiles, suddenly occurred to me whether this was ok or not due to the tiles not being “flat”. Anyone done wall hung toilets with metro tiles?
cheers!!