A friend of mine has asked me to install a new bathroom suite for him. Though with the addition of a show cubicle as well as a free standing bath and new towel radiatior. So my question is on installation advice are these. The new towel rad i would like to use chrome pipework up into the rad and run copper pipework under the floorboards. Now its not practible to use a compression fitting below the floor as it will be relaid with laminted flooring, can you file off the chrome finish so you can solder to this?, or is there another method of coupling this up.
The basin waste pipework also i am thinking would look better in a chrome finish also, can you but 1 1/4 chrome pipe for this or do you buy the type that sleeves over the top of the waste?. If so how is it joined to the plastic waste under the floorboards, pushfit elbow not practible again cos of no/lack access. Any advice appreciated, thank you.
The basin waste pipework also i am thinking would look better in a chrome finish also, can you but 1 1/4 chrome pipe for this or do you buy the type that sleeves over the top of the waste?. If so how is it joined to the plastic waste under the floorboards, pushfit elbow not practible again cos of no/lack access. Any advice appreciated, thank you.