Hi;
I am about to start on my Bathroom and toilet. I have a plumber lined up and someone to skim the walls.
I need to "manage" the work and will be stripping the current tiles and wallpaper as well as tiling and laying a wood flooring.
My questions are what order and how:
We want to keep the sink and toilet as they are in good nick (Twyfords) just going to replace the furniture. The toilet does not need to be moved but the cistern may need removing to paint behind?
Should I tile before re-fitting the sink and bath?
Should the floor get laid first or last?
The steps as i think:
1. Strip tiles.
2. Remove sink, bath and cistern.
3. Clean walls of tile adhesive etc.
4. Lay new supply and waste pipe work.
5. Route electrics.
6. Repair and Skim walls.
7. Bond new plaster with PVA / Water??
8. Fit floor (only going in bathroom).
9. Paint and tile.
10. Refit sink, bath and cistern.
11. Tidy up!!
Any pointers on the above?
I am about to start on my Bathroom and toilet. I have a plumber lined up and someone to skim the walls.
I need to "manage" the work and will be stripping the current tiles and wallpaper as well as tiling and laying a wood flooring.
My questions are what order and how:
We want to keep the sink and toilet as they are in good nick (Twyfords) just going to replace the furniture. The toilet does not need to be moved but the cistern may need removing to paint behind?
Should I tile before re-fitting the sink and bath?
Should the floor get laid first or last?
The steps as i think:
1. Strip tiles.
2. Remove sink, bath and cistern.
3. Clean walls of tile adhesive etc.
4. Lay new supply and waste pipe work.
5. Route electrics.
6. Repair and Skim walls.
7. Bond new plaster with PVA / Water??
8. Fit floor (only going in bathroom).
9. Paint and tile.
10. Refit sink, bath and cistern.
11. Tidy up!!
Any pointers on the above?