Hi Guys
I have bought my bathroom suite and tiles, basically im wriitng it all down to plan it but having trouble what order things should be done, if i outline what im doing i would appreciate someone to help me create a job list in order.
I am replacing the existing suite with a new one, everything in the same positions, i am tiling the walls and placing tiles on the floor also.
I have to remove the skirtings and make good the walls for tiling. Do I have to reenforce the timber floor with plywood for the the floor tiles, i read this in a diy book.
Also I do tile around the pedistal and toilet? or completley tile the floor and then secure them ontop of the floor tiles?
Would appreciate a list of order of jobs and some tips of things to watch out for - the electric shower is also being replaced but the cold water pipe is visible I want this tucked away out of site, a job for a plumber? and if so how much should I expect to pay for insatlling an electric shower?
Thanks for your help
I have bought my bathroom suite and tiles, basically im wriitng it all down to plan it but having trouble what order things should be done, if i outline what im doing i would appreciate someone to help me create a job list in order.
I am replacing the existing suite with a new one, everything in the same positions, i am tiling the walls and placing tiles on the floor also.
I have to remove the skirtings and make good the walls for tiling. Do I have to reenforce the timber floor with plywood for the the floor tiles, i read this in a diy book.
Also I do tile around the pedistal and toilet? or completley tile the floor and then secure them ontop of the floor tiles?
Would appreciate a list of order of jobs and some tips of things to watch out for - the electric shower is also being replaced but the cold water pipe is visible I want this tucked away out of site, a job for a plumber? and if so how much should I expect to pay for insatlling an electric shower?
Thanks for your help