Re-tiling the whole bathroom! ( floor to ceiling). So I want to check I'm doing it right!
I've striped the old tiles. A lot of plaster has come off the stud walls, leaving bare plasterboard. The rest of the walls are rough plaster and lots of old adhesive!
So I'll chip all the lose bits of the wall, and I've got Bal adhisive. Can I just use the adhesive as I go, so it levels out the surface for tiling? I'll check the bal site to see if I need a primer, the tub seem ambigious with it's instructions.
I'm measuring up at the moment, to work out where to start tiling. As a last minute change of plan I have decided to tile in a horizontal, staggered brick work pattern. Is it realy difficult to do, or do I just have to be extra carefull with the spacing?
I've striped the old tiles. A lot of plaster has come off the stud walls, leaving bare plasterboard. The rest of the walls are rough plaster and lots of old adhesive!
So I'll chip all the lose bits of the wall, and I've got Bal adhisive. Can I just use the adhesive as I go, so it levels out the surface for tiling? I'll check the bal site to see if I need a primer, the tub seem ambigious with it's instructions.
I'm measuring up at the moment, to work out where to start tiling. As a last minute change of plan I have decided to tile in a horizontal, staggered brick work pattern. Is it realy difficult to do, or do I just have to be extra carefull with the spacing?