Hi - not sure if this is the correct place for this, apologies if it's not.
We've had someone re-doing our bathroom and it's been going really slowly - but that might just be me so I thought I'd check here.
Bathroom is approx 6' x 8' (8' high), one door, two small windows, walls have been plastered, floor latexed, only thing in is the bath (wall to wall at one end), pipes have all been bonded in, there are 2 pipes for the radiator sticking out and two for the sink (neither toilet and sink are in yet - but everything is ready).
So it needed tiling - tiles are ceramic 300 x 600 and 9mm thick and we're having it tiled floor to ceiling.
I wasn't expecting it to take too long - but it's been 3 days and we're only a little over half way there.
How long would you expect this to take?
Thanks,
Kerry
We've had someone re-doing our bathroom and it's been going really slowly - but that might just be me so I thought I'd check here.
Bathroom is approx 6' x 8' (8' high), one door, two small windows, walls have been plastered, floor latexed, only thing in is the bath (wall to wall at one end), pipes have all been bonded in, there are 2 pipes for the radiator sticking out and two for the sink (neither toilet and sink are in yet - but everything is ready).
So it needed tiling - tiles are ceramic 300 x 600 and 9mm thick and we're having it tiled floor to ceiling.
I wasn't expecting it to take too long - but it's been 3 days and we're only a little over half way there.
How long would you expect this to take?
Thanks,
Kerry