(And so we move on to next room)
We have 3 plastered walls and 1 stud wall with aquapanel - whole room to be tiled floor to ceiling
Floor at the moment is mositureproof t&g
Been reading and have conflicting info
Should we replace the t&g with exterior ply ?
Then backer board and tiles ?
We have 3 plastered walls and 1 stud wall with aquapanel - whole room to be tiled floor to ceiling
Floor at the moment is mositureproof t&g
Been reading and have conflicting info
Should we replace the t&g with exterior ply ?
Then backer board and tiles ?