Time for my weekley post somewhere on DIYnot- must be progresisng o.k. as its now about plasterboard
Due to getting the stuff up to the loft am using 900x1800mm pb to underline stub walls sloping ceiling/flat ceiling in our loft conversion.
I have spaced battens (at rightangle to rafters over 70mm celotex) at 900mm ctrs i.e to support the long edge of borad. Battens are screw fixed using extra long screws to each existing rafter which are @ about 300 ctrs
I am having some help with the dry lining and the chap helping says the 900 spacing is fine my gut instinct says I should put an additional batten to the middle of the board making the ctrs 450 approx.
Any advice on what's best?
Thanks
J
Due to getting the stuff up to the loft am using 900x1800mm pb to underline stub walls sloping ceiling/flat ceiling in our loft conversion.
I have spaced battens (at rightangle to rafters over 70mm celotex) at 900mm ctrs i.e to support the long edge of borad. Battens are screw fixed using extra long screws to each existing rafter which are @ about 300 ctrs
I am having some help with the dry lining and the chap helping says the 900 spacing is fine my gut instinct says I should put an additional batten to the middle of the board making the ctrs 450 approx.
Any advice on what's best?
Thanks
J