Fitted this boiler a few years back as a plan S with boiler supplying hot water in the kitchen and shower. Bathroom hot feed is from cylinder.
House was extended by a builder. Extention has underfloor heating.
While the original S plan MV auxillary switches applied clean loop across boiler '3 and 4' to start boiler, builder's plumber used the third MV auxillary switch to apply 240 volts to the boiler (in effect boiler was live when switched off at boiler front panel).
PCB had to be changed as the fan would 'kick' but not run a few months later.
Soon the boiler started to fail with the new PCB. The failure indication now was 30 degree light flashing with boiler locked out. Reset would restart the boiler sequence. The 30 degree LED started to flash as soon as the pump was powered up by the PCB. Baxi adviced a replacement PCB. This was done but same thing is happening again couple of month later.
Can Potty pros assist repairs as the client is a gentleman and a good friend. Email in profile.
House was extended by a builder. Extention has underfloor heating.
While the original S plan MV auxillary switches applied clean loop across boiler '3 and 4' to start boiler, builder's plumber used the third MV auxillary switch to apply 240 volts to the boiler (in effect boiler was live when switched off at boiler front panel).
PCB had to be changed as the fan would 'kick' but not run a few months later.
Soon the boiler started to fail with the new PCB. The failure indication now was 30 degree light flashing with boiler locked out. Reset would restart the boiler sequence. The 30 degree LED started to flash as soon as the pump was powered up by the PCB. Baxi adviced a replacement PCB. This was done but same thing is happening again couple of month later.
Can Potty pros assist repairs as the client is a gentleman and a good friend. Email in profile.