Hi guys,
I have a Baxi Bahama 100 combi boiler with the Honeywell controls package (installed 2000) which has been very relaible other than problems with water side flow switches failling at the usual 2 yearly intervals, however I now have a problem in that the boiler fails to fire up and the green power on neon is not lit.
I am a Control & Instrumentation engineer and experienced with industrial oil fired steam boilers, electrics, electronics, piped services etc and I have checked the control pcb fuse is ok and following the fault finding flowchart 230V ac is present on the control pcb connector X1 pins 2-3 and connector X3 pins 4-5, I am unsure if the neon being faulty will inhibit firing or if the control pcb needs to be replaced.
It is currently -6 degrees Celsius here so any advice would be greatly appreciated.
Thanks
I have a Baxi Bahama 100 combi boiler with the Honeywell controls package (installed 2000) which has been very relaible other than problems with water side flow switches failling at the usual 2 yearly intervals, however I now have a problem in that the boiler fails to fire up and the green power on neon is not lit.
I am a Control & Instrumentation engineer and experienced with industrial oil fired steam boilers, electrics, electronics, piped services etc and I have checked the control pcb fuse is ok and following the fault finding flowchart 230V ac is present on the control pcb connector X1 pins 2-3 and connector X3 pins 4-5, I am unsure if the neon being faulty will inhibit firing or if the control pcb needs to be replaced.
It is currently -6 degrees Celsius here so any advice would be greatly appreciated.
Thanks