At work, we're in a shared office unit, and from time to time there's lecky work goes on.
Lastest is that what was a meeting room let out with the office it's next to is being let as a separate small office - so needed it's services splitting off. Each unit has a separate DNO supply, so there was some discussion as to options - I got involved as the centre manager "isn't very technical" and she asked me to interpret what she was being told.
So the suggestion was to fit a DB in the "new office" and run a submain up from the meter room - either taking a feed from the landlords supply and using a private meter so the landlord can bill the tenant, or getting a new DNO supply in so the tenant can pay their own bills (as per all the other units).
The sparky they've got in comes from half way across the country, so I can only assume they are cheap - our landlord doesn't spend money he doesn't have to
I already had some reservations about this sparky as a few weeks ago when he was replacing a DB in another office I was sort of angling to try and get some of the old breakers as spares - they are old "Bill" boards and the breakers are rather expensive now, I had to buy one a few years ago for the UPS and IIRC it was £50 The sparky seemed genuinely to believe that these boards "had" to be replaced as they are obsolete. I can only assume he was referring to the lack of RCD which as I understand it for our installation is only needed for the sockets - everything else is still compliant, all circuits are in metal trunking and the very old (the place was built around 1990) DBs are metal cased. For the sockets, I reckon they could be made compliant by putting a standalone RCD in the DIN rail enclosure above the DB which only holds one or two contactors.
For this job, I also got asked about cable routes from the meter room, but the guy didn't seem to want to accept the answer that there's a space down inside a wall - or more likely I suspect he didn't want the hassle. So the existing supply to the existing office has been split, a large 3 phase switch fuse installed (only one phase used) and the supply tee'd off to the new office where there's another 3 phase switch fuse (one phase used). I took a peek while the sparky wasn't around. And 2 new private meters.
But to top it off, today the new tenants were moving in, actually upsizing from another unit, and I got asked about reading the meter - specifically about the economy 7.
I think there may be arguments ahead. The units all have storage heating, with radio teleswitches down in the meter room - and a contactor in the DIN rail enclosure above the DB switching on the storage elements. But the private meters are single rate only. I can't see the landlord wanting to charge less than the peak rate, and I can't see the tenant wanting to pay more than the night rate for the heating.
Lastest is that what was a meeting room let out with the office it's next to is being let as a separate small office - so needed it's services splitting off. Each unit has a separate DNO supply, so there was some discussion as to options - I got involved as the centre manager "isn't very technical" and she asked me to interpret what she was being told.
So the suggestion was to fit a DB in the "new office" and run a submain up from the meter room - either taking a feed from the landlords supply and using a private meter so the landlord can bill the tenant, or getting a new DNO supply in so the tenant can pay their own bills (as per all the other units).
The sparky they've got in comes from half way across the country, so I can only assume they are cheap - our landlord doesn't spend money he doesn't have to
I already had some reservations about this sparky as a few weeks ago when he was replacing a DB in another office I was sort of angling to try and get some of the old breakers as spares - they are old "Bill" boards and the breakers are rather expensive now, I had to buy one a few years ago for the UPS and IIRC it was £50 The sparky seemed genuinely to believe that these boards "had" to be replaced as they are obsolete. I can only assume he was referring to the lack of RCD which as I understand it for our installation is only needed for the sockets - everything else is still compliant, all circuits are in metal trunking and the very old (the place was built around 1990) DBs are metal cased. For the sockets, I reckon they could be made compliant by putting a standalone RCD in the DIN rail enclosure above the DB which only holds one or two contactors.
For this job, I also got asked about cable routes from the meter room, but the guy didn't seem to want to accept the answer that there's a space down inside a wall - or more likely I suspect he didn't want the hassle. So the existing supply to the existing office has been split, a large 3 phase switch fuse installed (only one phase used) and the supply tee'd off to the new office where there's another 3 phase switch fuse (one phase used). I took a peek while the sparky wasn't around. And 2 new private meters.
But to top it off, today the new tenants were moving in, actually upsizing from another unit, and I got asked about reading the meter - specifically about the economy 7.
I think there may be arguments ahead. The units all have storage heating, with radio teleswitches down in the meter room - and a contactor in the DIN rail enclosure above the DB switching on the storage elements. But the private meters are single rate only. I can't see the landlord wanting to charge less than the peak rate, and I can't see the tenant wanting to pay more than the night rate for the heating.