Hi
I am fitting an expansion vessel (along with prv and filling loop etc) to a fully pumped S plan heating system to convert the system to a sealed system from open vented.
The boiler manufacturer (Worcester bosch) recommends the it is situated in the return close to the boiler.
I have read other info that says it should be situated close to the pump suction would mean its in the flow.
Can anyone tell me which is the best location?
I am fitting an expansion vessel (along with prv and filling loop etc) to a fully pumped S plan heating system to convert the system to a sealed system from open vented.
The boiler manufacturer (Worcester bosch) recommends the it is situated in the return close to the boiler.
I have read other info that says it should be situated close to the pump suction would mean its in the flow.
Can anyone tell me which is the best location?