I'm hoping to install a wet underfloor system between joists.
Going by the book, the drying time, is about a month for a 25mm biscuit screed.
It makes sense, but I wonder if I could blend in a small amount of accelerant admixture to speed the drying time.
Has anyone tried it? Or got an opinion?
Going by the book, the drying time, is about a month for a 25mm biscuit screed.
It makes sense, but I wonder if I could blend in a small amount of accelerant admixture to speed the drying time.
Has anyone tried it? Or got an opinion?