Hello,

I'm currently digging my trenches for an extension. The only sections that are left to dig are for 2 internal foundations which will support the weight for a block and beam floor. These are quite awkward to dig long the side of my existing house.

My query is how deep would they need to be? The trenches I've dug so far are roughly 900mm deep hitting chalk and flint. As they are only taking the weight of the flooring and no walls I imagine they won't need to be as deep. I know building control should advise however I would like to dig them tomorrow before they come on Monday and hopefully sign it off :)

Thanks,
Neil
 
Sponsored Links
Hello,

I'm currently digging my trenches for an extension. The only sections that are left to dig are for 2 internal foundations which will support the weight for a block and beam floor. These are quite awkward to dig long the side of my existing house.

My query is how deep would they need to be? The trenches I've dug so far are roughly 900mm deep hitting chalk and flint. As they are only taking the weight of the flooring and no walls I imagine they won't need to be as deep. I know building control should advise however I would like to dig them tomorrow before they come on Monday and hopefully sign it off :)

Thanks,
Neil
300 mm should be fine
 
Hello,

I'm currently digging my trenches for an extension. The only sections that are left to dig are for 2 internal foundations which will support the weight for a block and beam floor. These are quite awkward to dig long the side of my existing house.

My query is how deep would they need to be? The trenches I've dug so far are roughly 900mm deep hitting chalk and flint. As they are only taking the weight of the flooring and no walls I imagine they won't need to be as deep. I know building control should advise however I would like to dig them tomorrow before they come on Monday and hopefully sign it off :)

Thanks,
Neil

As has been already stated if it picking up the floor loadings you should go down to good load-bearing strata. That could well be the 900mm you have gone down too for the main trenches. Sadly it is not for Building Control to advise, but to check you have done it correctly.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top