Block infill between steel rsj's

Joined
10 Dec 2024
Messages
7
Reaction score
0
Country
Ireland
Building a steel rsj garage with 6 foot high blockwork between the rsj's. Do I need to put any dpc's in the blockwork? Will be plastering the outside. TIA
 

Attachments

  • 20250309_112014.jpg
    20250309_112014.jpg
    523.5 KB · Views: 41
Building a steel rsj garage with 6 foot high blockwork between the rsj's. Do I need to put any dpc's in the blockwork? Will be plastering the outside. TIA
Hi M,
You need a damp course anywhere there is damp, that you don't want to get into the wall.
C.
 
Building a steel rsj garage with 6 foot high blockwork between the rsj's. Do I need to put any dpc's in the blockwork? Will be plastering the outside. TIA
What's stopping those column base fixing bolts from just shearing off?

How thick is the edge of the concrete?
 
What's stopping those column base fixing bolts from just shearing off?

How thick is the edge of the concrete?
I don't know what's stopping the bolts from shearing but they have been done like this for many years without any problems. Theres 14 inches of concrete with steel around the edges.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top