Block Paving Maintenance

Joined
5 Nov 2008
Messages
560
Reaction score
22
Country
United Kingdom
I have to pull up a few rows of block paving for the installation of ACO drain.

When I go to re-lay the bricks taken out whats the best method of bedding them back down, I remember when it was done they used a wacker but what is ok to use for this small amount?

Many Thanks
 
Sponsored Links
a poly float tapped down well on top of the sand and then trowel it smooth and level. It's easiest to lift a few extra's to make sure you run into the old bed at the same level.

Then pop them down and give them all a dunt with a rubber mallet or the handle of a lump hammer, then kiln dried sand between.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top