I'm about to have my gas meter moved to the location shown in yellow (pipe also in yellow) below and a new door way cut in on the red outline.
As you can see in the photo there is a fairly large cross slope to the block paving in front of this area and it also falls away the further you get from the house. The level of the new door is quite high being 280mm on the left and 360mm on the right so I need a step or two.
The block paving has been cleaned since the photo. Has anyone got any ideas or example photos of a step that looks good and takes up the required height?
As you can see in the photo there is a fairly large cross slope to the block paving in front of this area and it also falls away the further you get from the house. The level of the new door is quite high being 280mm on the left and 360mm on the right so I need a step or two.
The block paving has been cleaned since the photo. Has anyone got any ideas or example photos of a step that looks good and takes up the required height?