I am currently renovating a house and in changing the bathrooms and kitchen I want to block off two redundant drains that are no longer required.
In the kitchen there is a gulley in the middle of the kitchen floor, 100mm, (think of Granny's scullery!) that is no longer needed and in the bathroom there is a 100mm drain connection in the floor that runs through a back inlet gully outside and then to the main drains.
What is the accepted method of blocking these off?
Can I just fill them with concrete or similar or should they be dug up, it's a bungalow with solid floors, and blanked off at the inspection chamber outside?
In the kitchen there is a gulley in the middle of the kitchen floor, 100mm, (think of Granny's scullery!) that is no longer needed and in the bathroom there is a 100mm drain connection in the floor that runs through a back inlet gully outside and then to the main drains.
What is the accepted method of blocking these off?
Can I just fill them with concrete or similar or should they be dug up, it's a bungalow with solid floors, and blanked off at the inspection chamber outside?