Hi All,
I've searched for this but couldn't find what I'm after.
I'm bricking up an external 900 x 2100 doorway - I'm doing the block inner leaf and a pro's going to do the outer leaf. I've a few questions:
1. With the door gone, I have a concrete screed floor at the base, can I lay the inner leaf blocks straight onto this ?
2. Do I need to remove the plaster/render down each reveal and at the top of the opening before laying the blocks or can I just 'fill the hole' ? I'm going to tie the blocks to each side of the opening using a metal bracket every 2 courses, and put a wall tie in every 2 courses for the guy to tie his outer leaf to.
3. Do I need to incorporate any d.p.c. around the opening. If so, does anyone have any views of how to fit it please ?
Thanks in advance,
P.J.
I've searched for this but couldn't find what I'm after.
I'm bricking up an external 900 x 2100 doorway - I'm doing the block inner leaf and a pro's going to do the outer leaf. I've a few questions:
1. With the door gone, I have a concrete screed floor at the base, can I lay the inner leaf blocks straight onto this ?
2. Do I need to remove the plaster/render down each reveal and at the top of the opening before laying the blocks or can I just 'fill the hole' ? I'm going to tie the blocks to each side of the opening using a metal bracket every 2 courses, and put a wall tie in every 2 courses for the guy to tie his outer leaf to.
3. Do I need to incorporate any d.p.c. around the opening. If so, does anyone have any views of how to fit it please ?
Thanks in advance,
P.J.